Descon Secures E&i Project From Oryx Gtl

11 October, 2022

image

Descon Engineering’s Industrial Services Division - Qatar has been awarded a project under E&I segment by Oryx GTL Limited.
The scope of work includes laying down complete pipeline of above ground/underground firewater system in plant secondary area, EPIC of plant wide F&G detection system upgrade, plant wide emergency visual alarm upgrade and reduce potable water supply temperature to safety showers/eye washers. The project will have direct positive impact on safety of the client’s plant operations, and in turn their business. The job spans over a period of 16 months and is expected to be completed by January 2024. 
This is an encouraging win for Descon as the company is working hard and leveraging its reputation in the region to grow in the E&I segment.