Descon Engineering Wins Epc Retrofit Project From Borouge

15 November, 2023

image

Descon Engineering's Industrial Services Division (UAE) has recently been awarded its biggest EPC retrofit project - "EPC FOR UPGRADE STUB-ENDS FOR B3 HDPE CCCW SYSTEM " project by Borouge.

The objective of this project is to enhance the reliability of the Closed-Circuit Cooling Water (CCCW) System by Upgrading HDPE Stub-Ends' (at various locations across the plant), along with associated Piping, Mechanical, Civil & Structural, E&I works.

The project duration is 20 months, including execution of some critical jobs in Borouge-03 TA window.

Descon Engineering takes pride in strengthening its EPC retrofit segment in the UAE market and upholding the client's trust in company's strong abilities to be part of their journey of achieving operational excellence.