Descon Engineering Wins Epc Contract For Fg Absorber Tray Supply & Replacement At Sohar Refinery

16 February, 2023

image

Descon Engineering’s Industrial Services Division has won an award from OQ for EPCC Contract for FG Absorber (C-2251) Tray Supply and replacement during Sohar Refinery 1-TA. The scope includes design, detail engineering, supply of Trays and associated material.

Replacement of existing trays with upgrade design in collaboration with OEM “GTI Solutions” shall be carried out during the refinery’s planned TA, followed by testing and commissioning support services.

OQ is a repeat customer for Descon and this project will further strengthen Descon’s relationship with OQ downstream in Oman.